Technical Documentation DP2

person Björn Lindberg
Here you will find technical drawings and documentation of the drilling platform DP2.
— Safety plan production deck
© Norsk Oljemuseum

Technical Drawings

Beskrivelse    Årstall
Vestsiden – West side view with new liebherr crane 1985
Boredekket – General arrangement drilling deck 1977
Plattformdekk – General arrangement support frame & tank level 1981
Plantegning – modul 1 – Plot plan module 1 1981
Plantegning – modul 2 – Plot plan module 2 1981
Boredekk og helikopterdekk – Equipment and Platform Layout, Drilling deck and Helideck 1982
Helikopterlandingsområdet – Helicopter landing area. view from above 1983
Boredekk – DP2 equipment & platform layout intermediate drilling deck 1985
Pumpehus og lagertanker – Plot plan pump house & storage tanks 1985
Utstyr nedre boredekk – Equipment & platform layout lower drilling deck 1986
Nordsiden – Remounting drawing elevation from north side emergency ladder 1986
Redningsutstyr vestside – Remounting drawing elevation from west side emergency ladder 1986
Boreslam-modul – Plot plan forex neptun mud cement module 1987
Plantegning modul 3 – Plot plan module 3 ( SHT 2-2 ) 1990
Kjellerdekk – Cellar deck general arrangement 1992
Plantegning modul 3 – Plot plan module 3 (SHT-1-2) 1992
Østsiden – From east side emergency ladders 1986
DP2 & Chris Chenery – elevation & plan VI 1978
DP2 unit A drilling deck framing 1974
DP2 modules 1,2,3,4 1980
Compressed air system in module 2 & cement 1982
Compressed air system in generator room 1982
Compressed air system on rig 1982
Axonometric of industrial water system 1982
Guiding system for cable carrier trolleys 1983
Rig plan derrick 1985
From east side emergency ladders 1986
DP2 identification plates location layout
Plot plan – pump house & storage tanks
Plot plan – module 1
Safety plan production deck
Potable water system
P&ID – flare system
P&ID – mud system
DP2 module 1 piping plan
Piping general arrangement forex neptun
Piping general arrangement forex neptun 2
DP2 drilling derrick profile layout north
DP2 drilling derrick profile layout south
Unit A truss 1
Unit A cellar deck framing
Plattformunderstellet – Jacket
Elevation A eln-2144-002
Elevation B eln-2144-003
Perspective eln-2144-001
Horizontalfrmg plan at el 100 000 328 1 eln-2144-109 1975
Internal joint stiffening at el 70 865 232-6 eln-2144-120 1975
Internal joint stiffening at el (-) 50 290 165 eln-2144-119 1975
JKT vert frm. at col lines 2 eln-2144-103 1975
Horizontal framing plan at el 11430 37-6 eln-2144-105 1979
Jacket vertical framing at col line 3 eln-2144-148 1979
Jacket vertical framing at col line A and B eln-2144-101 1979
Horiz frmg plan at el. (-)28 955 95 0 eln-2144-106 1984
Horizontal frmg. plan at el 6 095 20+-0 eln-2144-104 1984
Jk. vert frmg at col line 4 eln-2144-149
Loading plans
Lower drilling deck allowable liveload 1984
Upper drilling deck allowable liveload 1984
Upper drilling deck allowable liveload production deck 1984
Cellar deck loading diagram eln-2144-004
Drilling deck loading diagram eln-2144-005
Topsides – Area and Access Plans
Access and platforms general arrangement – sheet 1 of 2 1985
Access and platform general arrangement – sheet 2 of 2 1985
Area key plan 1985
Crane coverage DP2 2003

 

Technical Documentation

 Rapport  – Report Årstall/Year
DP2 Structural Parts Design, Fabrication and Installation Resume DnV 1977
 1977
DP2 OPERATIONS MANUAL – FRIGG FIELD – VOLUME 1 (MARK ONE)
 1993
Drawings and Installation doc 1980-90
FRIGG DP2 – INSTALLATION REPORT 1978

 

Published July 27, 2017   •   Updated October 13, 2020
© Norsk Oljemuseum
close Close

Leave a Reply

Your email address will not be published. Required fields are marked *