Platforms Posted on July 27, 2017October 13, 2020 by Filip Fremo MingeTechnical Documentation – the Frigg Field person Björn Lindberg Here you will find technical drawings and documentation of the Frigg field. — Frigg feltlokasjon © Norsk Oljemuseum Technical Drawings Beskrivelse Årstall Frigg Field layout – for Platform only 1975 Frigg Field platforms and lines general layout 2005 Frigg Field – Central Complex Frigg site – alignment sheet location Frigg site – alignment sheet CDP1 to TP1 Frigg site – alignment sheet – FP to TP1 Frigg Field North Sea – Frigg Field location Technical Documentation and Progress Reports Rapport – Report Årstall/Year Frigg Field Development – Summary Report 1978 Frigg Competence Requirement Manual for Offshore Personnel 2002 Frigg Design Manual – Summary – from Total Oil Marine part 1 1976/77 Future Operations (FUTOP) Implementation Manual 1997 Future Operations (FUTOP) Training Manual 1997 Forget Me Not Report – Future Plan for Frigg Facilities Operations 1989 Summary of Projects and Studies for Tie-ins of New Fields to Frigg and Heimdal 1987 Frigg Field Concrete Substructures Ospar Consultation Document 2002 Frigg Cessation Plan 2003 – Byggerapporter – construction reports Frigg monthly report january 1974 1974 Frigg monthly report may 1975 1975 Frigg monthly report october 1975 1975 Frigg monthly report january 1976 1976 Frigg monthly report february 1976 1976 Frigg monthly report march 1976 1976 Frigg monthly report april 1976 1976 Frigg monthly report may 1976 1976 Frigg monthly report june 1976 1976 Frigg monthly report july 1976 1976 Frigg monthly report august 1976 1976 Frigg monthly report september 1976 1976 Frigg monthly report october 1976 1976 Frigg monthly report december 1976 1976 Related media: navigate_before navigate_next Published July 27, 2017 • Updated October 13, 2020 Share this:Click to share on Facebook (Opens in new window)Click to share on LinkedIn (Opens in new window)Click to share on Twitter (Opens in new window) More about platforms Field: Platforms Drilling Platform 2 – DP2 Drilling and production platform 2 (DP2) stood on the Norwegian side of Frigg. Field: Platforms Quarters Platform – QP The quarters platform (QP) provided accommodation for the three central installations on the field. It was also the nerve centre for Frigg, with control room, helideck and telecommunications. © Norsk Oljemuseum close Close