Teknisk dokumentasjon CDP1

person Björn Lindberg
Her finner du tekniske tegninger og dokumentasjon av bore- og brønnplattformen CDP1.
— DP1 conversion cathodic protection 2
© Norsk Oljemuseum

Tekniske tegninger

Beskrivelse    Årstall
Convension arrangement of anodes 1975
Convension – west elevation 1975
CDP1 development well targets
CDP1 P&ID’S
Equipment & platform layout – drilling
Equipment & platform layout – helideck
Module layout and drawing key plan
Elevation layout – west side
Elevation layout – east side
DP1 conversion cathodic protection
DP1 conversion cathodic protection 2
DP1 conversion anodes ref electrod
CDP1 Saipem integration architecture
CDP1 Frigg field living quarters layout
Symbols standard details abbreviations
Riser schematic and pipework on CDP1
CDP1 Frigg field living quarters layout 2
CDP1 Saipem integration – general arrangement
CDP1 Saipem integration architecture 2
CDP1 Frigg field living quarters layout 3
Description of survey stations
CDP1 Saipem integration architecture 3
CDP1 Frigg field living quarters layout 4
Piping plan outside PM4 – new living quarters
Piping plan – New living quarter east
Piping plan – Methanol storage tank
Piping plan – modules WH1B
Column Drawings
Location of ears on the Columns A1-MP-QD-5027
Main Deck, Column 1200 A1-MP-QD-4916
Main Deck, Column 1600 A1-MP-QD-4915
Main Deck, Column 2000 H4, H7, B4, B7 A1-MP-QD-5029
Main Deck, Column 2000, H4, H7, B4, B7 A1-MP-QD-5033
Main Deck, Column 2000, H6 A1-MP-QD-4961
Main Deck, Column 2000, H6 A1-MP-QD-5028
Main Deck, Column 2000, H6 A1-MP-QD-5032
Main Deck, General Location of Bases plates on Main Deck A1-MP-QD-4965
Main Deck, Plates for columns top A1-MP-QD-4918
Main Deck, Type of Columns A1-MP-QD-5030
Orientation and marking of the templates A1-MP-QD-5018
Setting Anchor Bolts for Columns A1-MP-QD-5010
GBS General Arrangement
General Layout and Numbering FF-91-02-10-201 1975
General Layout Plan-Defenition of Geometry FF-91-02-10-202 1975
General layout-Upper Breakwater wall-Central Shaft-Numbering of Vertical and Horizontal Cables Between Level 65.00 and 107.00 A1-MP-QV-3215 1975
Vertical Section FF-91-01-00-052 1975
Extra Pads Reqd. for Doris Deck, MPX-DP1 Conersion B-EN-SS-164 1976
MP1-CDP1-General Arrangement A1-MP-QG-1051 1976
General Plan View, Support of guide frame A1-MP-QF-1032
Nomenclature A1-MP-QF-1237
Recapitulation of the Base Plates in the Platform A1-MP-M-1189
Reducer for Condutor Sleeve General View A1-MP-QF-2007
Towage Links (repartition) A1-MP-M-1014
Vertical View A1-MP-QF-1294
View Elevation For pipe 8 A1-MP-M-1242
Topsides – plot plans
Air Inlets for pressurizing system engine room Dis-J211b-139 1974
G.A. of Modules on Platform MPX – DP1 Conversion B-EN-AA-004 1975
Drilling Platform Perspective, MPX-DP1 Conversion B-EN-SS-001 1975
East Elevation on Modules, MPX-DP1 Conversion B-EN-AA-002 1975
Layout Elevation Dis-J211cd-2 1975
Lower Module Floor Plan EL. 128541 MPX to DP1 Conversion B-EN-AA-008 1975
Lower Module Roof Plan EL. 135.065, MPX – DP1 Conversion B-EN-AA-007 1975
Modules SD1, 2, 3 and Pumphouse Locations, MPX – DP1 Conversion B-EN-AA-010 1975
North Elevation, MPX to DP1 Conversion B-EN-AA-003 1975
Saipem Package Reaction, MPX – DP1 Conversion Wellhead Module 1975
Upper Module Roof Plan EL. 140765 T.O.S MPX – DP1 Conversion B-EN-AA-005 1975
Gen Assy Maintainence Hatches, CDP1 Platform CDP1-SS-465 1976
Location of Geophysical Instrument’n CDP1 Platform Level 107 000 CDP1-SS-473 1976
Staircases to Main Deck CDP1-AA-66 1976
Staircases to Production Modules CDP1-AA-67 1976
Staircases to Saipem Packages CDP1-AA-68 1976
Plot plan north elevations +139000 and +136000 1981
Plot plan south, elevation +139000 1989
Equipment layout module BR1 2003
Equipment layout, module BR2 2003
Equipment location (north), production module level 126403 2003
Equipment location (south), production module level 126403 2003
GA of core and service deck for early pull-in of risers 2003
Layout DIS.J 211b-1 2003
Plot plan (north) elevation 130.000, PM4 2003
Plot plan (north) elevation 130000, PM3 2003
Plot plan (north) elevation +130000 2003
Plot plan (south) elevation 130 000 2003
Plot plan, plan and elevations +143000 and +146000 2003
Plot plan, service deck level (north) 2003

 

Teknisk dokumentasjon

 Rapport  – Report Årstall 
CDP1 as a decommissioned platform -operations manual 1990 revised 1997  1997
CDP1 Decommission Report  1990
CDP1 DFI. Topside and GBS (2 books) 1978
CDP1 P&ID’S produksjonsflyt 1980-85
CDP1 – SUMMARY OF STEEL ITEMS EMBEDDED IN CONCRETE TO BE CHECKED ON PLATFORM 1984
CDP1 DECOMMISSIONING – FINAL REPORT 1991
CDP1 OPERATIONS MANUAL – FRIGG FIELD – VOLUME 1 (MARK ONE) 1986
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – AS BUILT DRAWINGS – VOLUME 1 1983
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – GENERAL DRAWINGS – VOLUME 2 1980-85
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – STEEL WORK EMBEDDED IN CONCRETE – VOLUME 4 1980-85
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – CONDUCTOR GUIDE FRAME – VOLUME 5 1980-85
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – UTILITY RISERS – VOLUME 6 1980-85
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – CATHODIC PROTECTION – VOLUME 7 1980-85
FRIGG FIELD BLOCK 10 1 – CDP1 – SUBSEA AS BUILT FILE – SEAL CAISSONS – VOLUME 8 1980-85
Publisert 2. juli 2017   •   Oppdatert 13. oktober 2020
© Norsk Oljemuseum
close Lukk

Legg igjen en kommentar

Din e-postadresse vil ikke bli publisert. Obligatoriske felt er merket med *