Teknisk dokumentasjon TCP2

person Björn Lindberg
Her finner du tekniske tegninger og dokumentasjon av prosessplattformen TCP2.
— General view, concrete UC330-1231-00-001
© Norsk Oljemuseum

Tekniske tegninger

Beskrivelse    Årstall
Jack up for installation of risers 1974
General view, concrete UC330-1231-00-001 1975
TCP2 Presentation drawing – west elevation 1975
Pullhead and sheave positons column 3 1975
Fire and safety layout cellar deck 1976
Overall general arrangement 1976
Piping arrangement area 46 fire pump room 1980
Piping arrangement area 63 cellar deck plan 1980
Piping arrangement module 31 mail deck 1980
General arrangement accesses in column 5 1988
Elevation plot plan 1991
General arrangement upper deck – provisor
General arrangement mail deck – provisor
General arrangement cellar deck – provisor
Plot plan TCP2 cellar deck phase III b
TCP2 escape routes and rescue stations E
TCP2 escape routes and rescue stations W
General arrangement of column C1 on TCP2 P
General arrangement of column C3 on TCP2 P
General arrangement of column C5 on TCP2 P
General arrangement accesses in column no. 3.1
General arrangement accesses in column no. 3.2
Frigg TCP2 – MSF steel frame
TCP2 – Presentation drawing – North elevator
Upper deck equipment layout
Main deck equipment layout
Cellar deck equipment layout
General arrangement accesses in column 5 2
Overall polt plan compression area
Mail deck plot plan level 109-058
Upper deck plot plan level 118-848
Piping arrangement area 65 cellar deck plan
Cellar deck plot plan level 100-008
Column 3 sections
Service layout column 5 scheme 5
Service layout column 3 at EL+86_000
General plan perspective
Pictorial view of external risers looking
Column 5 J5-18 Setting out details
Column 5 setting out plan for J5 and J7
Key plan for support and insert plates in skirt
General arrangements and installation of internal riser bend
Pipeline pull and riser tie in installation
Pipeline pull and riser tie in installation 2
Elevation of J tube J6 column 5
Plan of support for riser guides & J tube
Plan of support for riser guides & J tube 2
Plan of supports for riser & J tube clamps
Elevation of condensate piping from el – OM
Elevation of condensate piping from El 67
Condensate tank El 27 370 General arrangement
J Tube messenger cable installation & details
Plot plan mail deck
Plot plan upper deck
Plot plan cellar deck
Plot plan workshop store module 04
Frigg Field North sea – TCP2 installation
Lifting arrangement for module 03
Crane Drawings
Frigg crane replacement program – crane coverage plan 2005
General drawings for Column MSF
General view – Frigg TCP2 UC-330-1231-00-001 1977
GBS GA Drawings
General view, concrete UC330-1231-00-001 1975
Inside GBS Column 1 General
General arrangement of column C1 on TCP2 1980
Inside GBS Column 3 General
General arrangement of column C3 on TCP2 1980
General arrangement of top column 3 1981
General arrangement accesses in column no 3 1983
General arrangement accesses in column no 3 SHT 2-2 1988
General arrangement accesses in column no 3 2 1992
General arrangement accesses in column no 3 3 1992
Inside GBS Column 5 General
General arrangement of column no C5 1980
General arrangement of accesses in column no 5 SHT 1-2 1987
General arrangement of accesses in column no 5 SHT 2-2 1988
Installation
Bridge between TP1 and TCP2 1981
Plan Cellar Deck, Location of Towing Winches, Caprains Bridge and Walkways 1981
Outside GBS
Condeep Elf Frigg TCP-2 – Cut Loose in Aandalsnes 1976
Outside GBS -> Column various
Roofs plan view Roof cell 8 (A3 and A4) 1985
Roofs plan view. Roof cell 15 (A3 and A4) 1985
Roofs plan view roof cell 16 (A3 and A4) 1985
Roofs plan view roof cell 17 (A3 and A4) 1985
Roofs plan view roof cell 18 (A3 and A4) 1985
Roofs plan view roof cell 19 (A3 and A4) 1985
Roofs plan view general layout (A3 & A4) 1997
Outisde GBS -> External risers, general
External risers riser R1E – 32 General layout (A3 and A4) 1985
External risers R3E 26 General layout (A3 and A4) 1985
External risers riser R2E 26 General layout (A3 and A4) 1993
External risers general layout (A3 and A4) 1997
Outisde GBS -> General
Legend 1985
Operation area of cranes 1985
Relaton MLW. VS. Construction levels 1985
General – perspective view South-West side (A3 and A4) 1989
General – perspective view North side (A3 and A4) 1994
General – perspective view South-East side (A3 and A4) 1997
General plan view 1997
General perspective view South-East side Glossary (A3 and A4) 1998
Outside GBS -> Roofs plan view
Roofs plan view cell 2 (A3 and A4) 1985
Roofs plan view roof cell 7 (A3 and A4) 1985
Roofs plan view cell 9 (A3 and A4) 1985
Roofs plan view roof cell 11 (A3 and A4) 1985
Roofs plan view roof cell 12 (A3 and A4) 1985
Roofs plan view roof cell 13 (A3 and A4) 1985
Roofs plan view column C1 (A3 and A4) 1985
Roofs plan view roof column C5 (A3 and A4) 1985
Roofs plan view cell 6 (A3 and A4) 1986
Roofs plan view roof cell 4 (A3 and A4) 1992
Roofs plan view cell 14 (A3 and A4) 1992
Roofs plan view roof cell 10 (A3 and A4) 1993
Roofs plan view roof column C3 (A3 and A4) 1994
Outside GBS -> Structure
Concrete structure plan view (A3 and A4) 1985
Elevation east side (A3 and A4) 1985
Elevation north side (A3 and A4) 1985
Elevation south side (A3 and A4) 1985
Elevation west side (A3 and A4) 1985
Sections through columns level -59.215 MLW 1985
Sections through columns level -14.735 MLW 1985
Sections through columns level +24.965 MLW 1985

 

Teknisk dokumentasjon

 Rapport  – Report Årstall /Year
Frigg TCP2 hook-up in Åndalsnes 1  1977
Frigg TCP2 hook-up in Åndalsnes 2  1977
TCP2 Extension Final Report Volume 1 – Project Description 1984
TCP2 Extension Final Report Volume 2 – Project Development 1984
TCP2 Extension Final Report Volume 3 – Cost 1984
TCP2 Compression Final Report Volume 1 – Design Synopsis 1981
TCP2 Compression Final Report Volume 2.1 – Project Development 1981
TCP2 Compression Final Report Volume 2.2 – Project Development 1981
TCP2 Compression Final Report Volume 3 – Cost Report 1981
TCP2 Gas Compression Training Manual – Volume 1 1980
TCP2 Gas Compression Training Manual – Volume 2 1980
TCP2 Extension (NEF Tie-In) – Training Manual – Volume 2 1984
TCP2 Permanent Production Modules DFI Resume DnV 1978
TCP2 Concrete Structure DFI Resume DnV 1977
TCP2 OPERATIONS MANUAL – FRIGG FIELD – VOLUME 1 (MARK ONE) 1991
TCP2 Operations Manual Volume 1 General platform part 2 1994-2004
TCP2 Steel Support Frame DFI Resume DnV 1977
TCP2 Treatment Platform Project Description Vol. 1 Book 1 1977

 

Publisert 2. juli 2017   •   Oppdatert 13. oktober 2020
© Norsk Oljemuseum
close Lukk

Legg igjen en kommentar

Din e-postadresse vil ikke bli publisert. Obligatoriske felt er merket med *