Platforms Posted on July 27, 2017October 13, 2020 by Filip Fremo MingeTechnical Documentation TP1 person Björn Lindberg Here you will find technical drawings and documentation of the treatment platform TP1. — Deck Units © Norsk Oljemuseum Technical Drawings Beskrivelse Årstall TP1 Support columns 1975 TP1 Support truss 1975 TP1 Permanent platforms in columns 1975 General arrangement – east elevation 1976 P&ID Glycol contractors 1976 TP1 Seperator & spherical pig receiver 1976 P&ID pig receiving traps & methanol inject 1976 TP1 Perspective 1976 Perspective of TP1 platform 1980 Plot plan upper level 1985 Plot plan lower level Plot plan cellar deck General arrangement of column C1 on TP1 General arrangement of column C2 on TP1 P&ID pig receiving traps & methanol inject 2 P&ID FWKO separators & spherical pig rec P&ID sales gas metering system P&ID Glycol contractors 2 P&ID utility flowsheet firewater pumps P&ID utility flowsheet diesel and gas turbin generation system System isometric of mail gas (sht 1 of 2) Isometric view of firewater piping at V3 & V33 Plan of flooding dewatering bypass arrangement TP1 sign plate Load diagram el (+)23008 Load diagram el (+)29548 Load diagram el (+)37168 Location of life boats sht 1 of 3 Location of lifeboats sht 2 fo 3 Location of lifeboats sht 3 of 3 General arrangement column C1 material handling 5,5 kV one line diagram of protection relay MCC marshalling box wiring MB1 left Right side marshalling box MB2 wiring Key plan of co-ordination drawing for column System isometric of firewater for treatment modules Deck units Modules TP1 – Navigational light during tow out TP1 – General isometric view of platform Modules installation sequences sheet 1 TP1 firewater system piping TP1 Identification plate GBS General arrangement of column 1 on TP1 platform 1982 General arrangement of column 2 on TP1 platform 1982 Simplified flooding and dewatering P&ID 2003 GBS Outside GBS General General perspective view NE and NW sides (A3 & A4) 1984 General perspective view SE and SW sides (A3 & A4) 1984 Operation areas of crans 1984 Relations MLW VS construction levels (A3 & A4) 1984 General perspective view NW and SW sides (A3 & A4) 1987 General perspective view NW and SW sides Glossary (A3 & A4) 1987 General plan view 1987 GBS Roof plan views Roofs plan view general layout (A3 & A4) 1984 GBS Structural drawings inside the columns 0000 Grating plan column 2 level +17.300 1984 Grating plan column 1 level +18.300 1984 Grating plan column 1 level +5000 1984 As built existing framing col. C1 level +12400 1986 As built existing framing column 1 level +5000 1986 As built existing framing column 2 level +12.400 1986 As built existing framing column 2 level +17.300 1986 As built existing framing column 2 level +5000 1986 As built exixting framing column 1 level +18.300 1986 Grating plan column 2 level +12.400 1986 Grating plan column 1 level +12.400 1986 – 1986 GBS Structure 0000 Elevation East side (A3 & A4) 1984 Elevation North side (A3 & A4) 1984 Elevation South side (A3 & A4) 1984 Section through columns (A3 & A4) 1984 Concrete structure plan view (A3 & A4) 1987 Plot plans General arrangement – East elevation ELN-2099-004 1975 General arrangement – South elevation ELN-2099-003 1975 Load plan modules as built 1990 Load plan pancakes as built 1990 Plot plan – lower level 1999 Plot plan – upper deck 1999 Pot plan – cellar deck 2002 – Technical Documentation Rapport – Report Årstall DFI resume concrete structure 1977 Frigg Treatment Platform TP1 – Fact sheet 1975-78 Contractors monthly report no. 1 (february 1974) 1974 Contractors monthly report no. 9 (october 1974) 1974 Contractors monthly report no. 10 (november 1974) 1974 Contractors monthly report no. 11 (december 1974) 1974 Contractors monthly report no. 12 (january 1975) 1975 Contractors monthly report no. 13 (february 1975) 1975 Contractors monthly report no. 14 (march 1975) 1975 Contractors monthly report no. 15 (april 1975) 1975 Contractors monthly report no. 16 (may 1975) 1975 Contractors monthly report no. 17 (june 1975) 1975 Contractors monthly report no. 18 (july 1975) 1975 Installation, final report 1976 Installation procedure (McDermott Hudson) 1975 Operation manual, vol. 1, section 1 (Cancelled) 1997 Operation manual, vol. 1, section 2 1997 Operation manual, vol. 1, section 3 1997 Operation manual, vol. 1, section 4 1997 Operation manual, vol. 1, section 5 1997 Operation manual, vol. 1, section 6 1997 Operation manual, vol. 1, section 7 1997 Operation manual, vol. 1, section 8 1997 TP1 – PROJECT DESCRIPTION VOL 1 BOOK 1 1977 TP1 ALWYN TIE-IN – PROJECT DESCRIPTION VOLUME 1 – BOOK 1 1986 TP1 OPERATIONS MANUAL – FRIGG FIELD – VOLUME 1 (MARK ONE) 1985 Related media: navigate_before navigate_next Published July 27, 2017 • Updated October 13, 2020 Share this:Click to share on Facebook (Opens in new window)Click to share on LinkedIn (Opens in new window)Click to share on Twitter (Opens in new window) More about platforms Field: Platforms Drilling Platform 2 – DP2 Drilling and production platform 2 (DP2) stood on the Norwegian side of Frigg. Field: Platforms Quarters Platform – QP The quarters platform (QP) provided accommodation for the three central installations on the field. It was also the nerve centre for Frigg, with control room, helideck and telecommunications. © Norsk Oljemuseum close Close